card 1: Items noted before and right after settlement, 23 October 2000.

   

CARD 2.1:   Items noted for the 90 day walkthrough.

CARD 2.2:   Items noted after the 90 day work.

These are some of the deficiencies, the complete list is 5 pages long.

 

Rest of sod coverage

Dead patches of lawn

Replacement lawn where the tree used to be

Dead/ailing plants

Loose/noisy floor boards

                Front of Master Closet door

                Inside Master closet

                Family room in front of Entertainment center

                Study in front and under the book cabinet

                Kitchen in front of drawers next to the sink

                Kitchen Island sways when walking in its vicinity

    In front of wall with dimmer switch

                Family room squeaks

                Living room by the bay window

Fireplace

               Draftiness

               Discolored stones

Heavy/loose windows in the family room

Noisy stairs

Hardwood floor in the foyer (gaps>1/8")

Missing basement window screen

These are some of the deficiencies still remaining after the 90-day work

 

Rest of sod coverage

Dead patches of lawn

Replacement lawn where the tree used to be

Dead/ailing plants

Loose/noisy floor boards

                Master Bedroom

                Master closet

                Family room

                Study

                Kitchen

    Powder room hallway

                Family room

                Dining room

                Living room

               

Fireplace

               Draftiness

               Discolored stones

What has become of the Insulation/Fireplace/HVAC contractors reports

Particle boards that have been installed instead of plywood

Heavy/loose windows in the family room

Noisy stairs (used to be two, now about 5)

Visible Carpet seams in areas that were worked on